The ideal choice for urban construction projects

The W 120 Fi on the construction site in Berlin-Mitte

Two projects on the same day

A W 120 Fi in Berlin demonstrates its versatility and outstanding performance and the high level of comfort provided by its fully-enclosed operator’s cabin.

The work schedule of contractor Enrico Feind’s milling crew called for the deployment of the company’s W 120 Fi on two milling projects on the same day – in the centre and on the outskirts of Berlin. The company operates an extensive fleet of over 30 state-of-the-art milling machines from Wirtgen and can offer exactly the right machine for every construction project. By preference, the experienced milling services provider deploys the W 120 Fi on projects in sensitive urban locations. The machine unites maximum performance, versatility, manoeuvrability and low-vibration working with outstanding operator-comfort, and completed both jobs within a very short time.

The Comfort Cabin provides ideal working conditions

The W 120 Fi is a firm favourite of the milling crews at Feind. With good reason – the Comfort Cabin reduces fatigue and makes the operator’s work much more comfortable. The fully-enclosed cabin provides a workplace in line with the latest ergonomic principles, provides protection against the weather and noise emissions and stops dust and dirt getting into the operator’s workspace. The advantages of the state-of-the-art operator’s platform of the W 120 Fi were also impressively demonstrated on the two construction sites in Berlin.

Learn more about the Comfort Cabin for the W 120 Fi

Michal Mrozinski, Machine Operator at Feind

‘Our company has a whole fleet of Wirtgen cold milling machines, but we always look forward to working with the W 120 Fi with the fully-enclosed operator’s cabin. It makes our job so much easier and more comfortable, and significantly reduces stress and fatigue in our tough everyday work on construction sites.’

Michal Mrozinski, Machine Operator at Feind

The ideal choice for urban construction projects

The outstanding manoeuvrability and compact dimensions of the W 120 Fi make it the ideal choice for milling applications on inner-city sites. In particular on the first job of the day, a site close to Potsdamer Platz with extremely limited space: the narrow street runs between office blocks and over an underground car park. Due to this rather challenging situation, the removal of two layers by milling required a particularly delicate touch. Thanks to its combination of high engine power and low weight, the W 120 Fi is exactly the right machine for a job like this. Thanks to its environmentally friendly engine technology and smart assistance systems, it was the ideal choice for the precise, cost-efficient and sustainable realisation of the milling project. In automatic mode, the innovative MILL ASSIST machine control system optimises the milling process by consistently selecting the most favourable balance between performance and costs. The result: improved machine performance, high efficiency, lower fuel consumption per ton of milled material and a considerable reduction of CO₂ emissions.


Powerful performance enables high operational flexibility

Immediately after the city-centre job in Berlin-Mitte, the machine was loaded up for the 30 km trip to the next job – this time in Marienfelde, on the outskirts of Berlin. Two totally different project sites on the same day are no problem at all for the powerful and efficient W 120 Fi. The highly-manoeuvrable machine is extremely productive, easy to transport from site to site and can be quickly reconfigured for a wide range of milling tasks. The job was finished within around one and a half hours.

Milling with the W 120 Fi in Berlin-Marienfelde.

Milling with the W 120 Fi in Berlin-Marienfelde.

Milling with the W 120 Fi in Berlin-Marienfelde.

Facts and figures – project details
Project in Berlin-Mitte
Completion time:
3 hours
Area:
65.5 m x 5.80 m
Asphalt pavement removal:
two layers, 350 m²
First layer:
10 cm
Second layer:
5–8 cm
Constructional features:
Gutters on both sides
Road bed:
Crushed stone
Project in Berlin-Marienfelde
Completion time:
1.5 hours
Overall asphalt surface area:
200 m²
Individual areas/removal:
40 m²/4 cm
126 m²/12 cm
Road surface area:
50 m x 5.40 m
Constructional features:
4 gate valves

You can find further details and comprehensive information on our product pages.