Our factory

The main BENNINGHOVEN factory in Wittlich

We create quality: The world’s largest and most modern factory for manufacturing asphalt mixing plants offers optimum conditions for production at the highest level.

The production is carefully structured according to the flow of materials and, thanks to generous capacities, precisely adapted to the plants. One crucial advantage is the location of the entire production chain under one roof – from pre-fabrication to shipping. An order-neutral pre-fabrication unit and a well-designed plant layout featuring modular components that can be combined together creates a high level of flexibility in planning, achieving short lead times and prompt assembly starts.

The factory is equipped with numerous pieces of advanced technology and sets new standards for manufacturing systems. An innovative layered ventilation system, intelligent lighting and energy solutions, and the modern surface treatment systems utilizing solvent-free powder coating technologies are just some of the highlights here. Other key points of focus include work comfort, health and safety, pollution prevention/control, and a positive work environment.

Facts and figures

  • 313,000 m² site area
  • 46,000 m² production site
  • 12,000 m² office building
  • €130 million investment volume
  • 500 employees
Show more Show Less

Our assembly line

Raw material storage

> Storage of all steel profiles and plates
> High-bay warehouse for sheet metal (875 t storage capacity)

Cutting

> Cutting of raw material
> TRUMPF laser cutting system
> Press brakes/shears
> Flame cutting/drilling system
> Cutting/drilling system
> Machining systems

Pre-fabrication

> Tacking/welding of assemblies (mixer, screen, etc.)
> Steel construction (e.g. steel supports for loading silo)
> Container construction (e.g. base frame for weighing/mixing section)
> Over 40 welding stations
> 2 welding robots

Surface treatment

> Pretreatment – sandblasting (automatic/manual)
> Powder coating (powder application/enameling)
> For dimensions up to L x W x H = 13 x 3.3 x 4 m, 22 t
> Painting
> 7 booths

Final assembly (mechanical)

> Final assembly to produce functional components
> Mechanical and electric installation

Final assembly (electrical)

> Control cabinet construction: assembly, wiring, inspection
> Installation in switch cabinet container/control cabinet

Central warehouse

> Goods receipt
> Order picking
> Goods dispatch
> Storage
> Delivery to final assembly, customer site, spare parts shipping
> Space for over 7,000 Euro pallets

Office building

> 5 floors plus basement
> 120 offices (approx.)
> Air-conditioned, open-plan workspaces with energy-saving LED lighting
> In the open-plan offices, sound isolation panels and plenty of storage options ensure a corresponding level of privacy for employees
> Workspaces are set up according to 5S criteria with long-term support provided for ergonomic working practices
> Workspaces next to windows, communal facilities (kitchens, meeting rooms, copier rooms, etc.) at the building core
> Same office facilities provided in main building and in production
> Parking lot with approx. 950 spaces has reserve capacity for future hires
> 24/7 controlled access to factory premises by gatehouse and security service