Tool change

Video instructions

Instructions on the installation and removal of crushing and screening tools

Safety warning

The actors in this training video are not wearing full protective equipment.

Under no circumstances should you copy this under work site conditions.

Wear reflective clothing, safety shoes, protective helmet, safety goggles, hearing protection, protective gloves and other protective equipment if work conditions make this necessary!

Wear hearing protection if necessary because a noise exposure level of 80 dB (A) can be exceeded.

MC 120(i) PRO

Changing the fixed and articulated crusher jaw, the side wedges and pressure plate on the mobile jaw crusher MC 120(i) PRO

Tool change
MR 110/130(i) EVO2

Changing the rotor ledges, impact plates, overload plate, wear plates and impact bars on the mobile impact crusher MR 110/130(i) EVO2

Tool change
MCO 110(i) PRO

Preparation, removal, replacement and installation of the crushing tool on the mobile cone crusher MCO 110(i) PRO

Tool change
MS 702/703/952/953(i) EVO

Changing the screen surface on the mobile classifying screen plants MS 702(i) EVO, MS 703(i) EVO, MS 952(i) EVO and MS 953(i) EVO

Tool change
MC 110 Z(i) EVO

Changing distance plates and pressure plates on the mobile jaw crusher MC 110 Z(i) EVO

Tool change
MCO 9(i) EVO

Preparation, removal, replacement and installation of the crushing tool on the mobile cone crusher MCO 9(i) EVO

Tool change
MC 110(i) EVO2

Changing movable crushing jaws, pressure plates, fixed crushing jaws and wedges on the MC 110 EVO2