Tending KMA 220i portable cold recycling plant at Allan Myers New Kent, Va., HMA facility are plant mechanic Steven Morris, operator Gage Browning and quality control manager Craig Rayfield.

KMA 220i keeps it cold

Cold in-plant recycling with KMA 220i gets warm reception from Virginia DOT

After over a decade of experience, the Virginia Department of Transportation (VDOT) has expanded its use of cold central plant recycling, and is spreading the word via technical papers and webinars.

VDOT can rely on a decade of experience using cold central plant recycling to rebuild its interstates. In 2011 the commonwealth completed an in-place pavement recycling project on I-81 near Staunton in the foothills of the Blue Ridge Mountains. That project consisted of a 3.66-mile section of southbound I-81 in Augusta County. And most recently, in 2021, cold central plant recycling was being used on the reconstruction of I-64 in the Hampton Roads region.

Three in-place pavement recycling techniques

On I-81, VDOT employed three in-place pavement recycling techniques – full-depth reclamation (FDR) and cold in-place recycling (CIR) utilizing Wirtgen mobile equipment, and cold Iin-plant recycling (CCPR) using the Wirtgen KMA 220i mobile cold recycling mixing plant. That project marked the first time in the United States that these three recycling techniques were combined in one project on the interstate system.

Tolles Produkt

Full depth reclamation

Full depth reclamation is an engineered rehabilitation technique in which the full thickness of the asphalt pavement and a portion of the underlying materials are uniformly pulverized and blended to provide an upgraded, homogeneous material in one pass. The reclaimed materials may be improved and strengthened by using mechanical, chemical or bituminous stabilization, the latter via foamed asphalt or asphalt emulsion.

Cold in-place recycling

Cold in-place recycling is a surface process in which specialized equipment cuts the top 4 to 6 in. or more of an existing poor quality pavement surface, grinds and resizes the reclaimed asphalt pavement (RAP), mixes it with foamed asphalt or asphalt emulsion binder, and replaces it in the right-of-way, ready for compaction and surface treatment or overlay. With CIR, Virginia calls for a typical depth of 4 to 6 in. and stabilizes the material with either foamed asphalt or asphalt emulsion.

Cold in-plant recycling

Lastly, cold central plant recycling involves RAP that has been crushed and screened and brought to a cold recycling plant like the KMA 220i to create a foamed or emulsified asphalt, or cement or lime slurry-stabilized base material, which is trucked out to a reconstruction site.

VDOT uses CCPR to create structural base material placed to a depth of 4-6 in., specifies foamed or emulsified asphalt as a stabilizer, and uses it as an alternate to deeper mill-and-fill/partial depth patching.

"The I-81 in-place pavement recycling project was completed quickly and cost-effectively," said the Virginia Transportation Research Council (VRTC) in 2014. "Because of its engineering excellence and innovation, the project earned several prestigious national awards. Nearly three years of good performance proved the success of the pavement produced with these in-place recycling processes. The surface and deep structure of the rehabilitated section are expected to remain sound for years to come."

CCPR for Virginia's I-64

Its success in using all three asphalt recycling techniques in reconstructing I-81, and its performance for years thereafter, led to VDOT's use of the three techniques in an ongoing three-segment rebuild of I-64. There, in Segment III, the Wirtgen KMA 220i is producing more than 220 tons per hour of foamed asphalt structural base for the I-64 rebuild, and the entire process spotlights the manner in which VDOT reconstructs its high-volume highways in an environmentally sustainable manner.


Picture on the right: KMA 220i recycles RAP into foamed asphalt at full capacity for owner Allan Myers for use as subcontractor on I-64 project.

Tolles Produkt

In 2021 the I-64 Capacity Improvements Project work was in Segment III of a three-segment project to improve traffic flow in Virginia's Tidewater peninsula. Improvements include replacement of existing lanes, the addition of 12-ft.-wide travel lanes in the median, and new 12-ft.-wide shoulders in each direction.

The $178 million Segment III is 8.2 miles long and, according to VTRC, with the earlier two segments, constitutes one of the largest pavement recycling initiatives in North America. Recycling will result in an estimated $15 million cost savings total for Segments I, II and III. Over the course of the I-64 widening projects, it's estimated that nearly 1.2 million tons of recycled materials will be used. That sums up to savings of about 10 % in cost. With another mix-design and a higher RAP rate in the mix – savings up to 50 % can be achieved.

From the bottom, the Segment III section design is 12-in. of FDR, a 2-in. asphalt open graded drainage layer, 5-in. of BSM from the KMA 220i, and 4-in. surface course of stone matrix asphalt (SMA).

Allan Myers Inc. was prime contractor for Segment II, and was CCPR and asphalt placement subcontractor for Segment III. While state specs say Allan Myers could have used its KMA 220i to stabilize the RAP using asphalt emulsion, instead it chose to use foamed asphalt for Segments I, II and III.

Liquid “foamed” asphalt

Foamed asphalt or bitumen incorporates liquid “foamed” asphalt as a recycled mix stabilizing agent for bases or FDR, in which hot liquid asphalt is foamed with water and air, and is then injected into RAP in a mixing chamber in a mobile plant, or a self-propelled recycler/reclaimer.

This permits use of less liquid asphalt and much lower mixing temperatures, which benefits the environment. Depending on the degree of presence of fines in the existing materials to be recycled, up to 1 percent cement or hydrated lime may be required to act as a carrier or “dispersing agent” for the liquid asphalt to assist its spread throughout the pulverized material.

"The KMA 220i is easy to run, so long as you keep up with the maintenance and the clean-up," says Steven Morris, KMA 220i plant mechanic for Allan Myers. "You keep on top of your cement and make sure all the feeders are feeding. You make sure all the skirt rubber is cleaned up and that the weigh bridges are clean; that way it reads correctly."

Tolles Produkt

"The KMA 220i is easy to run, so long as you keep up with the maintenance and the clean-up."

Steven Morris, KMA 220i plant mechanic for Allan Myers

"On start-up, getting your base line is a little tricky because you have to work with your lab," Morris says. "But after that, it's pretty much plug and play. As long as everything's running steadily, it's a smooth operation but with walking around and checking everything, keeping your water full."

The foamed asphalt mix design was prepared by Stephanie Drain P.E., Charleston, Ill., and Wirtgen's Mike Marshall. "We have between 80 and 85 percent RAP, around 14 percent No. 10 screenings," says Craig Rayfield, quality control manager for Allan Myers, Williamsburg, Va.. "We have 2.5 percent liquid asphalt, and 1 percent portland cement."

Early morning load of foamed asphalt base mix heads out to I-64

The performance-graded asphalt for foaming is PG 64-22 spec, and for the mix a moisture specification is maintained to assist compaction. Unlike the I-81 project – in which RAP was coming off the job site, foam-mixed, and returned to the site – in this project existing stockpiled RAP from different jobs was being used.

"We have RAP from all over the area," Rayfield says. "When that RAP arrives it's unprocessed. A contract crushing company processes the material to 1/2-in. to 3/8-in. size, which pretty much gives us about a hundred percent passing the half-inch sieve."

But because the RAP comes from different job sites, it varies in residual asphalt content, which will affect the foamed mix design. To get around that, the stockpiles are blended so they will produce a RAP with a reliable, consistent average percent residual asphalt.

"The processing takes the RAP and blends it into a homogenous mix of a certain particle size range," Rayfield says. "Then our lab technicians will pull samples to run gradations and asphalt contents. That way we have an idea of what's going into the product, and we can control it."

"The processing takes the RAP and blends it into a homogenous mix of a certain particle size range."

Craig Rayfield, quality control manager for Allan Myers, Williamsburg, Va.

Stationary mode for mobile plant

While eminently mobile – the KMA 220i is mounted on a three-axle flatbed trailer to ensure ease of transport and set-up near a job site – Allan Myers' KMA 220i is in a stationary location at its New Kent, Va., hot mix asphalt plant just off I-64 and west of the three segments.

"The plant is portable, but I would say it's 'semi-stationary' right now," Rayfield says. "We've added larger asphalt tanks, up to 22,000 gallons total, for highest production capacity, and a larger cement silo for better production. And we have a 5,000-gal. water tank on the back side, eliminating the need to hook into a water line or well system. It wouldn't take much effort to get it portable again, and we can move it if we want to, but we have no need to now."

Planned VDOT reconstruction segments for I-64 may mean the KMA 220i stays where it is indefinitely. "It's in a very strategic location right now," Rayfield adds.

A typical shift of 9.5 to 10.5 hours will produce 1,600 to 1,800 tons per day of foamed asphalt base mix. "These guys get here at 4:30 in the morning, and run up to 700 tons on the ground; we then start shipping and the plant keeps up with it the rest of the day," Rayfield says. "We're looking at 27,000 more tons to finish the project, with a total forecast of 170,000 tons of cold central plant BSM foam mix."

Foamed asphalt may be stockpiled as storage to maintain the required flow of material to the job for paving. "We found that we’re better of just coming in early and making the mix, and let it sit a couple of hours before placement," Rayfield says.

Tolles Produkt

"We found that we're better off just coming in early and making the mix, and let it sit a couple of hours before placement."

Craig Rayfield, quality control manager for Allan Myers, Williamsburg, Va.

Back in Segment II

Back in Segment II, Allan Myers had to get used to the plant and production of foamed base mix.

"When this product came here originally, a lot of us were skeptical," Rayfield says. "We were shy of it, but it didn't take long to figure it out. The KMA 220i is a great product. It's right for us and it's great for the environment, because we have a mountain of unprocessed RAP that we now have something to utilize it with."

"It's clean, it doesn't smoke, and it doesn't smell," says Allan Myers' Morris. "It has no pollution. We can run a whole day shift on less than three-quarters of a tank of fuel, which we calculated as 10.2 gallons per hour."

"It's clean, it doesn't smoke, and it doesn't smell. It has no pollution."

Steven Morris, KMA 220i plant mechanic for Allan Myers

"That represents a huge savings, along with the amount of RAP that's going into it," Rayfield adds. "As far as being effective and efficient, it's very cost-effective. At Allan Myers, if there's a way we can do something better, or be innovative, we jump on it. We tackled the challenge, bid the job, and got the information we needed to design the mix. It's been smooth sailing ever since."

And while the 220 tons per hour that the Wirtgen plant can produce is adequate, Rayfield could use even more volume. With the large piles of RAP being piled all across the country, a job of that size could even be managed with two KMA plants working simultaneously to place more material even faster on the ground. Saving time, cost, and renewing the road-network at a faster pace.