The sections of the highway to be reconstructed, were located close to the city of Lamia and the town of Kamena Vourla are extremely busy and important highway intersections. In all, the project involved the rehabilitation of an area of more than 540,000 sq ft / 50,000 m² of asphalt roadway in areas where complete closure of the highway would have led to absolute traffic chaos. The most efficient option in view of this was the use of a cold recycling train from the Wirtgen Group. Thanks to in-situ cold recycling, it was possible to reduce the construction time to be expected when using conventional methods by around 50% and direct the traffic flow around the rolling construction site without any problems.