Apart from the SP 15(i) and SP 20(i) offset pavers at this year’s Bauma, Wirtgen is also showing a complete paving train for fully reinforced concrete paving.
Wirtgen Slipform Paver
If reinforcement needs to be laid in advance during the construction of concrete carriageways, the concrete can be fed in laterally using a placer/spreader. The placer/spreader travels in front of the slipform paver over the pre-placed reinforcement, while a truck mixer feeds the belt conveyor with concrete from the side. The concrete is poured evenly over the pre-placed reinforcement, in front of the slipform paver, and distributed across the entire working width. Once the truck mixer is empty, the belt conveyor can be folded away in a very short time to clear the path for the next mixer.